This afternoon I made a study on the one that will be the graphical interface for the program. Furthermore, along with GUI studies, I've designed also the first edition of the database, with some diagrams.
Deliverables Hub - GUI + DB
domenica 27 novembre 2011
Phase 2 - Design Part 2
Here it comes the second part of the design phase. Activity diagrams for all the actors and most of the actions doable by them. Today I will also focus on the development of the views (HTML only).
Deliverables Hub - Design part 2
Deliverables Hub - Design part 2
martedì 8 novembre 2011
Phase 2 : Design Part 1
After a brief requirement study, comes the design phase. I've started this second phase with some simple use cases diagrams. This is the output
Deliverables Hub - Design Part 1
Deliverables Hub - Design Part 1
Phase 1: requirements
Deciding what to do or not, I found the idea for my project in another university. In particular my work will refer to the one published in the course of software engineering @ PoliMi. These are the specifications:
Manage Project Homework (MPH) is an
application used by professors and students to facilitate the
organization of university courses
with project deliveries. The students work together in teams
composed by 1, 2 or 3 participants
and access the system through username and password. Each
student autonomously registers to the
system and has a profile containing his/her information (name,
last name, id, profile picture,
etc.). Moreover, he/she accesses to the information and functionalities
associated to the group he/she
belongs to.
Professors (who are registered into
the system by the system administrator) use the system to publish a
project description and to define the
set of the corresponding deliverables, which are characterized by a
name and a specific deadline (i.e.
“Delivery of design document” on 15 November at 23.59).
Moreover, professors can see the list
of all registered teams and the students composing it.
Each team can submit a deliverable
(i.e. a single file) by uploading it into the system until the deadline;
after that, it is still possible to
upload new versions of the deliverable, but these are marked and
highlighted as late submissions and
cause a penalty to be applied to the score associated to that
deliverable.
Each professor can download the
delivered files through two views. The first one organizes the
deliverables per group (thus, for
instance, it is possible to download, all deliverables produced by group
12), the second one per deliverable
type (thus, for instance, it is possible to download the RASD
documents produced by all groups).
Moreover, the professor, through an appropriate input form, can
evaluate the deliverables of each
group with a score between 1 and 10 (works not delivered are
automatically scored with 1 while
late deliverables get a final score equals to the score defined by the
professor minus the penalty that is
proportional to the delay time). After the professor assigns a score,
then the corresponding group can
visualize it. The system also takes care of computing the final score
obtained by each group as the average
of all the intermediate scores.
Finally, a professor can use the
system to enable some simple information sharing between groups. In
particular, he/she selects the group
that should have visibility on the deliverables produced by another
group. Of course, this will result in
the fact that the first group will have available some extra
functionality that enables the access
to the deliverables produced by the second groups.
I've decided to rename the work in "Deliverables Hub".
For this first phase I made a study of the requirements. This is the first output:
Deliverables Hub - Requirements Study
For this first phase I made a study of the requirements. This is the first output:
Deliverables Hub - Requirements Study